Showing 20 of 79 projects
| Project | Client | Location | Sector | Category | Year | Status | Description |
|---|---|---|---|---|---|---|---|
| 12 Km Road from Thana Bypass to Chakdara Including Bridges | Pakhtunkhwa Highways Authority / C&W Department | Thana Bypass to Chakdara | Civil & Bridges | Road | 2016 | Completed | Construction of 12 km road from Thana Bypass to Chakdara including bridges. |
| 16 Km Long Access Road to Munda Headworks Including Internal Roads | Irrigation Department | Munda Headworks, Charsadda | Civil & Bridges | Headworks | 2015 | Completed | Construction of 16 km access road to Munda Headworks including internal roads. |
| Ashuran Hydropower Project: Rehabilitation and Commissioning of Complete Power House | Sarhad Hydel Development Organization (SHYDO), Govt of NWFP, Peshawar | — | Hydel & Thermal | Hydropower | 1991 | Completed | Rehabilitation project: installation, testing and commissioning of complete power house including electrical, mechanical… |
| Bio Gas Plant at Harichand Agricultural Engineering, Tarnab | Harichand Agricultural Engineering, Tarnab | Tarnab | Mechanical & Electrical | Industrial | 1983 | Completed | Design, fabrication and erection of 3,000 cft bio gas plant. |
| Bio Gas Plant Project: Design, Fabrication and Erection throughout NWFP | Ministry of Petroleum and Natural Resources, Islamabad | NWFP | Mechanical & Electrical | Industrial | 1985 | Completed | Design, fabrication and erection of bio gas plants throughout NWFP. |
| Central Library Building and Air-Conditioning, Gomal University, D.I. Khan | Gomal University, D.I. Khan | D.I. Khan | Buildings | Institutional | 1986 | Completed | Construction of central library building and air-conditioning civil works at Gomal University. |
| Cherat Cement Factory: Erection of Main Raw Mill Section (300 ton) | Descon Engineering Ltd., Lahore | Cherat, Nowshera | Mechanical & Electrical | Industrial | 1984 | Completed | Erection of main raw mill section with all relevant electrical and mechanical systems at Cherat Cement Factory. |
| Cherat Electric Power Station: Installation, Erection and Commissioning of 18.9 MVA Power House | Siemens Pakistan Engineering (Pvt) Ltd, Islamabad | Cherat, Nowshera | Hydel & Thermal | Thermal Power | 1996 | Completed | Installation, erection and commissioning of 18.9 MVA power house for Cherat Electric Company. |
| Chukra Bukra Steel Pedestrian Bridge on Motorway M-1 Km 22+160 | National Highway Authority | Motorway M-1 | Mechanical & Electrical | Bridge | 2008 | Completed | Design, fabrication and erection of steel pedestrian bridge on Motorway M-1 at Km 22+160. |
| Construction of 18 Span RCC Bridge along with Road/Approach on River Swat from Thana Bypass to Chakdara University | Works & Services Department Malakand | Thana Bypass to Chakdara | Civil & Bridges | Bridge | — | Ongoing | Construction of 18 span RCC bridge with road and approach on River Swat. Work suspended after 2010 floods for re-design;… |
| Construction of 2 Nos. Bridges, D.I. Khan-Mughal Kot Road, N-50, Section II | Communication & Works Department, Govt of KPK | D.I. Khan | Civil & Bridges | Bridge | 2004 | Completed | Construction of two bridges on D.I. Khan-Mughal Kot Road, N-50 Section II. |
| Construction of 3 Nos. Bridges including Approach Road and Protection Works, Jandola-Wana Road | Communication & Works Department, Govt of KPK | South Waziristan | Civil & Bridges | Bridge | 2001 | Completed | Construction of three bridges with approach roads and protection works on Jandola-Wana Road. |
| Construction of 580 Low Cost Houses at Peshawar (Joint Venture with M/s Shah Zaman Pvt Ltd) | Peshawar Development Authority, Government of NWFP, Peshawar | Peshawar | Buildings | Residential | 1989 | Completed | Construction of 580 low cost houses at Peshawar as joint venture with M/s Shah Zaman (Pvt) Ltd. |
| Construction of Al-Hayat Hotel and Shopping Center, Peshawar | Mr. Haji Gul | Peshawar | Buildings | Commercial | 1986 | Completed | Construction of Al-Hayat Hotel and Shopping Center. |
| Construction of Approach Road and 2 Nos. Bridges on Escape Channel of CRBC Stage 2, Near Pahar Pur | Irrigation Department, Govt of KPK | D.I. Khan | Civil & Bridges | Irrigation | 2005 | Completed | Construction of approach road and two bridges on escape channel of CRBC Stage 2 near Pahar Pur. |
| Construction of Co-operative Bank Plaza, Peshawar | Frontier Highway Authority | Peshawar | Buildings | Commercial | 1988 | Completed | Construction of Co-operative Bank Plaza. |
| Construction of Fly Over and Roads on Railway Line, Ring Road, Peshawar | Pakhtunkhwa Highways Authority | Ring Road, Peshawar | Civil & Bridges | Road | 1999 | Completed | Construction of fly over and roads on railway line at Ring Road, Peshawar. |
| Construction of In-Situ Bored RCC Piles, CRBC RD 167+616 Super Passage in Flowing Water | Irrigation Department, Govt of KPK | D.I. Khan | Civil & Bridges | Irrigation | 1994 | Completed | Construction of in-situ bored RCC piles for super passage in flowing water at CRBC RD 167+616. |
| Construction of Islamabad-Peshawar Motorway M-1, Section II (Km 76+500 - 78+500) | National Highway Authority | Motorway M-1 | Civil & Bridges | Motorway | 2001 | Completed | Construction of Motorway M-1 Section II. Bayindir contract terminated by NHA. |
| Construction of Kashu Road and Bridge (Sub-Contract) | Pakhtunkhwa Highways Authority | — | Civil & Bridges | Road | 2005 | Completed | Construction of Kashu road and bridge as sub-contractor. |