Mechanical & Electrical Instrumentation

  • 1

    Design and construction of Takwara Steel Pipe Inverted Syphon for canal crossing passing under Nullah bed

    Irrigation depatrtment Dera Ismail Khan Sub-division Oct, 2011 Sep, 2012 Completed
  • 2

    Repair /Replacement of Damaged Gates at Kurram Garhi Headworks (Manufacturing & Installation of New Gates and Gearing System of Kurram Garhi Headworks.

    FDRD Irrigation Department Peshawar Mar, 2011 Sep, 2012 Completed
  • 3

    Motorway M-1: Dohkpur Steel Pedestrian Bridge on Motorway M-1 Km 8+230

    National Highway Authority May, 2006 Feb, 2008 Completed
  • 4

    Chukra Bukra Steel Pedestrian Bridge on Motorway M-1 Km 22+160

    National Highway Authority May, 2006 Feb, 2008 Completed
  • 5

    Pathara Garh Steel Pedestrian Bridge on Motorway M-1 Km-29+250

    National Highway Authority May, 2006 Feb, 2008 Completed
  • 6

    Thatha Khalil Steel Pedestrian Bridge on Motorway M-1 Km-17+290

    National Highway Authority May, 2006 Feb, 2008 Completed
  • 7

    Trach Rack Cleaning Systemn

    WAPDA May, 2005 Dec, 2007 Completed
  • 8

    NOKIA TOWERS Fabrication, Galvanization, Site Erection of Gate and Fencengs

    NOKIA Dec, 2005 Jul, 2005 Completed
  • 9

    Gantry Singe on (M-1) 4 Nos. 25000 mm Span

    National Highway Authority PMC Jv Dec, 2004 Jun, 2005 Completed
  • 10

    Nokia Towers Rehabilitation of Roof Towers

    Nokia, Pakistan Jan, 2005 Jun, 2005 Completed
  • 11

    Warsak Power House: Fabrication, instalation of water treatment plant to provide processed water to turbine shaft seals at Warsak Power House

    Water and Power Development Authority Jan, 2002 Mar, 2002 Completed
  • 12

    Warsak Rehabilitation Project Wsk-6 Special roof repairs to warsak power house

    Water and Power Development Authority Jan, 2001 Jan, 2002 Completed
  • 13

    Warsk Power House: Modification of warsak Power House Drainage Sump

    Water and Power Development Authority Jan, 2001 Mar, 2001 Completed
  • 14

    EOT Stock Yar Cranes Civil: Works/Fabrication/Erection and Commissioning of 15.5 Tons and 5 Tons EOT Stock Yard Cranes

    Pakistan Railways, Admn, Office, Locomotive Carriage Factory Rawalpindi Sep, 1996 Dec, 1997 Completed
  • 15

    Hayatabad Phase- V : Supply and installation of HT / LT Conductors, Transformers, Stringing etc. Phase V, Hayatabad, Peshawar

    Provincial Urban Development Board Government of NWFP, Peshawar Jan, 1990 Jan, 1991 Completed
  • 16

    Over Head Steel Bridge: Design, Fabrication & Erection of Overhead steel bridge over kohat Road Peshawar Cantoment

    Peshawr Cantonment Board, Peshawar Jan, 1990 Dec, 1990 Completed
  • 17

    Kakul Phosphate Plant Project: Civil, Mechnical and Electrical works (Taken on turn-key basis)

    Sarhad Development Authority, Govt of NWFP, Peshawar Jan, 1984 Dec, 1987 Completed
  • 18

    Hayat Abad Phase-II:Supply and installation of HT/LT Conductors, Transformers, Stringing etc. Phase II, Hayatabad, Peshawar

    Provincial Urban Development Board, Government of NWFP, Peshawar Dec, 1986 Dec, 1987 Completed
  • 19

    Over Head Steel Bridge: Design, Fabrication & Erection of Overhead Steel Bridge over G.T Road Peshawar City

    Peshawar Development Authority, Government of N.W.F.P Peshawar Aug, 1986 Jun, 1987 Completed
  • 20

    Gharibwal Cement Factory Project: Fabrication of Non Standard Components; Mechanical Erection testing & Commissioning of 15.5 Tons 30 meter Span Grab Crane

    Gharibwal Cement Factory Gharibwal May, 1985 May, 1986 Completed
  • 21

    Bio Gas Plant Project: Design fabrication and erection of Bio Gas Plat throuth out NWFP

    Ministry of Petrolium and Natural Resources Islamabad. Dec, 1984 Dec, 1985 Completed
  • 22

    Cherat Cement Factory Project: Erection of Main Raw Mill Secion (300 ton) with all relevant Elrectrical and Mechnical systmens at cherat cement Factory Nowshera

    Descon Enginrring Ltd. Lahore Feb, 1983 Feb, 1984 Completed
  • 23

    Bio Gas Plant Project Design Fabrication and erection of 3,000 cft Bio Gas Plant at Harichand

    Agricultural Engineering Tarnab Mar, 1983 Sep, 1983 Completed
  • 24

    Khyber Teaching Hospital Project: Design, Fabrication and commissioning of Tread Mill System (1st time B16in Pakistan)

    Khyber Teachning Hospital Peshawar Jan, 1983 Jun, 1983 Completed
  • 25

    Dir Forest Complex Project: Design fabrication and erection of Saw Dust Extraction System and allied strucutre

    Karkon (Pvt) Limited Peshawar Apr, 1982 Jul, 1982 Completed
  • 1

    Repair /Replacement of Damaged Gates at Kurram Garhi Headworks (Manufacturing & Installation of New Gates and Gearing System of Kurram Garhi Headworks.

    FDRD Irrigation Department Peshawar Mar, 2011 Sep, 2012 Completed
  • 2

    Design and construction of Takwara Steel Pipe Inverted Syphon for canal crossing passing under Nullah bed

    Irrigation depatrtment Dera Ismail Khan Sub-division Oct, 2011 Sep, 2012 Completed
  • 3

    Thatha Khalil Steel Pedestrian Bridge on Motorway M-1 Km-17+290

    National Highway Authority May, 2006 Feb, 2008 Completed
  • 4

    Pathara Garh Steel Pedestrian Bridge on Motorway M-1 Km-29+250

    National Highway Authority May, 2006 Feb, 2008 Completed
  • 5

    Chukra Bukra Steel Pedestrian Bridge on Motorway M-1 Km 22+160

    National Highway Authority May, 2006 Feb, 2008 Completed
  • 6

    Motorway M-1: Dohkpur Steel Pedestrian Bridge on Motorway M-1 Km 8+230

    National Highway Authority May, 2006 Feb, 2008 Completed
  • 7

    Trach Rack Cleaning Systemn

    WAPDA May, 2005 Dec, 2007 Completed
  • 8

    NOKIA TOWERS Fabrication, Galvanization, Site Erection of Gate and Fencengs

    NOKIA Dec, 2005 Jul, 2005 Completed
  • 9

    Nokia Towers Rehabilitation of Roof Towers

    Nokia, Pakistan Jan, 2005 Jun, 2005 Completed
  • 10

    Gantry Singe on (M-1) 4 Nos. 25000 mm Span

    National Highway Authority PMC Jv Dec, 2004 Jun, 2005 Completed
  • 11

    Warsak Power House: Fabrication, instalation of water treatment plant to provide processed water to turbine shaft seals at Warsak Power House

    Water and Power Development Authority Jan, 2002 Mar, 2002 Completed
  • 12

    Warsak Rehabilitation Project Wsk-6 Special roof repairs to warsak power house

    Water and Power Development Authority Jan, 2001 Jan, 2002 Completed
  • 13

    Warsk Power House: Modification of warsak Power House Drainage Sump

    Water and Power Development Authority Jan, 2001 Mar, 2001 Completed
  • 14

    EOT Stock Yar Cranes Civil: Works/Fabrication/Erection and Commissioning of 15.5 Tons and 5 Tons EOT Stock Yard Cranes

    Pakistan Railways, Admn, Office, Locomotive Carriage Factory Rawalpindi Sep, 1996 Dec, 1997 Completed
  • 15

    Hayatabad Phase- V : Supply and installation of HT / LT Conductors, Transformers, Stringing etc. Phase V, Hayatabad, Peshawar

    Provincial Urban Development Board Government of NWFP, Peshawar Jan, 1990 Jan, 1991 Completed
  • 16

    Over Head Steel Bridge: Design, Fabrication & Erection of Overhead steel bridge over kohat Road Peshawar Cantoment

    Peshawr Cantonment Board, Peshawar Jan, 1990 Dec, 1990 Completed
  • 17

    Kakul Phosphate Plant Project: Civil, Mechnical and Electrical works (Taken on turn-key basis)

    Sarhad Development Authority, Govt of NWFP, Peshawar Jan, 1984 Dec, 1987 Completed
  • 18

    Hayat Abad Phase-II:Supply and installation of HT/LT Conductors, Transformers, Stringing etc. Phase II, Hayatabad, Peshawar

    Provincial Urban Development Board, Government of NWFP, Peshawar Dec, 1986 Dec, 1987 Completed
  • 19

    Over Head Steel Bridge: Design, Fabrication & Erection of Overhead Steel Bridge over G.T Road Peshawar City

    Peshawar Development Authority, Government of N.W.F.P Peshawar Aug, 1986 Jun, 1987 Completed
  • 20

    Gharibwal Cement Factory Project: Fabrication of Non Standard Components; Mechanical Erection testing & Commissioning of 15.5 Tons 30 meter Span Grab Crane

    Gharibwal Cement Factory Gharibwal May, 1985 May, 1986 Completed
  • 21

    Bio Gas Plant Project: Design fabrication and erection of Bio Gas Plat throuth out NWFP

    Ministry of Petrolium and Natural Resources Islamabad. Dec, 1984 Dec, 1985 Completed
  • 22

    Cherat Cement Factory Project: Erection of Main Raw Mill Secion (300 ton) with all relevant Elrectrical and Mechnical systmens at cherat cement Factory Nowshera

    Descon Enginrring Ltd. Lahore Feb, 1983 Feb, 1984 Completed
  • 23

    Bio Gas Plant Project Design Fabrication and erection of 3,000 cft Bio Gas Plant at Harichand

    Agricultural Engineering Tarnab Mar, 1983 Sep, 1983 Completed
  • 24

    Khyber Teaching Hospital Project: Design, Fabrication and commissioning of Tread Mill System (1st time B16in Pakistan)

    Khyber Teachning Hospital Peshawar Jan, 1983 Jun, 1983 Completed
  • 25

    Dir Forest Complex Project: Design fabrication and erection of Saw Dust Extraction System and allied strucutre

    Karkon (Pvt) Limited Peshawar Apr, 1982 Jul, 1982 Completed
    -- Coming Soon --