Hydel/ Thermal Power Stations & Dams

  • 1

    Design, Manufacturing, Shifting, Site Installation, Testing and Commissioning of Trach Cleaning System at Hydel Power Station Rasul

    Water and power Development Authority Jan, 2006 Dec, 2006 Completed
  • 2

    Warsak Hydroelectric Power House (module warsak-2) Rehabilitation & special Emergency Repair to warsak Hydroelectric Power House (Collective including Module Warsk 1 & 2

    Water and power Development Authority Dec, 1991 Dec, 2005 Completed
  • 3

    Warsak Hydroelectric Power House (Module Warsak-2) Design, Manufacture, erection, testing/commissioning of draft tube & gates 12 Nos epoxy inlection and cementicious grouting arround turbine outer casings etc.

    Water and power Development Authority Dec, 2003 Dec, 2005 Completed
  • 4

    Warsak Hydroelectric Power House Rehabilitation Project (Warsak-1) Design, Manufacture, Supply, erection, testing and commissioning of 9 Nos Spilways Gates

    Water and power Development Authority Jan, 1998 Feb, 2001 Completed
  • 5

    Cherat Electric Power Station Project Installation Erection and commissioning of 18.9 KVA Power House

    Siemens Pakistan Engineering (Pvt) Ltd Islamabad (For cherat Electric Company, Cherat Nowshera. Jan, 1996 Jul, 1996 Completed
  • 6

    Upper Thal Hydropower Project: Installation, Testing & Commissioning of Complete Power House with all relevant equipment and systems, Upper Thal Hydropower Pro+B9ect, Distt Dir,

    Sarhad Hydel Development Organization (SHYDO) Govt of NWFP, Peshawar Aug, 1988 Aug, 1991 Completed
  • 7

    Ashuran Hydropower Project: Rehabilitation Project: Installation, Testing & Commissioning of complete Power House including electrical, mechanical and insturmentation

    Sarhad Hydel Development Organization (SHYDO) Govt of NWFP, Peshawar Jun, 1988 Jun, 1991 Completed
  • 8

    Warsak Dam Rehabilitation Project: a) Modification / Repair to intake gates of warsak Dam b) Modification / Repairs to Draft Tube Gates of Warsak Dam

    Chief Engineer (Hydel) North, WAPDA Warsak Dam Project Jan, 1989 Jan, 1990 Completed
  • 9

    Warsak Hydel Electric Power Station Rehabilitation Project: Fabrication, modification, installation, testing and commissiong of Intake Gates, including installation, electrcial termination, insturmentation, testing and commissioning of new 100 t Hoist.

    Water and power Development Authority Jan, 1987 Dec, 1989 Completed
  • 10

    Kohistan Hydel Power Projects; a) Jalkot Hydel Power Station, Bisham. B) Dubair Hydel Power Station.

    Power Wing. Irriogation Depatmant Govt. of NWFP, Peshawar Jan, 1985 Jan, 1986 Completed
  • 11

    Micro Hydel Power Station Project: Complete survey and submission of feasibility Report of 15 nos Mini/Micro Hydel Power Stations in Distt Chitral (NWFP)

    Power Wing, Irrigation Department, Government of NWFP, Peshawar Jan, 1982 Mar, 1984 Completed
  • 12

    Khazana Suger Mills Power Station Project: Installation / Erection and Commissioning of 2000 KVA Marobini Steam Turbine Power House.

    Sarhad Development Authority, Governament of NWFP, Peshawar Jan, 1983 Jan, 1984 Completed
  • 13

    Kalam Hydropower Project: Installation, testing & Commissioning of complete Power House with all relevant equipment a+B4nd Systems

    Power Wing, Irrigation Department, Government of NWFP, Peshawar Jan, 1982 Dec, 1983 Completed
  • 14

    Repairs to Units 1,2,3,& 4 of Warsak Hydro-electric Power House including repaired stabilization of concrete structure, isolation of main turbine and generator block frame up stream structure and tandan grouting of turbine block and draft tube structure installation of structure monitoring istrument

    Chief Engineer (Hydel) North, WAPDA Warsak Dam Project Jan, 1991 Jan, 1982 Completed
  • 1

    Design, Manufacturing, Shifting, Site Installation, Testing and Commissioning of Trach Cleaning System at Hydel Power Station Rasul

    Water and power Development Authority Jan, 2006 Dec, 2006 Completed
  • 2

    Warsak Hydroelectric Power House (Module Warsak-2) Design, Manufacture, erection, testing/commissioning of draft tube & gates 12 Nos epoxy inlection and cementicious grouting arround turbine outer casings etc.

    Water and power Development Authority Dec, 2003 Dec, 2005 Completed
  • 3

    Warsak Hydroelectric Power House (module warsak-2) Rehabilitation & special Emergency Repair to warsak Hydroelectric Power House (Collective including Module Warsk 1 & 2

    Water and power Development Authority Dec, 1991 Dec, 2005 Completed
  • 4

    Warsak Hydroelectric Power House Rehabilitation Project (Warsak-1) Design, Manufacture, Supply, erection, testing and commissioning of 9 Nos Spilways Gates

    Water and power Development Authority Jan, 1998 Feb, 2001 Completed
  • 5

    Cherat Electric Power Station Project Installation Erection and commissioning of 18.9 KVA Power House

    Siemens Pakistan Engineering (Pvt) Ltd Islamabad (For cherat Electric Company, Cherat Nowshera. Jan, 1996 Jul, 1996 Completed
  • 6

    Upper Thal Hydropower Project: Installation, Testing & Commissioning of Complete Power House with all relevant equipment and systems, Upper Thal Hydropower Pro+B9ect, Distt Dir,

    Sarhad Hydel Development Organization (SHYDO) Govt of NWFP, Peshawar Aug, 1988 Aug, 1991 Completed
  • 7

    Ashuran Hydropower Project: Rehabilitation Project: Installation, Testing & Commissioning of complete Power House including electrical, mechanical and insturmentation

    Sarhad Hydel Development Organization (SHYDO) Govt of NWFP, Peshawar Jun, 1988 Jun, 1991 Completed
  • 8

    Warsak Dam Rehabilitation Project: a) Modification / Repair to intake gates of warsak Dam b) Modification / Repairs to Draft Tube Gates of Warsak Dam

    Chief Engineer (Hydel) North, WAPDA Warsak Dam Project Jan, 1989 Jan, 1990 Completed
  • 9

    Warsak Hydel Electric Power Station Rehabilitation Project: Fabrication, modification, installation, testing and commissiong of Intake Gates, including installation, electrcial termination, insturmentation, testing and commissioning of new 100 t Hoist.

    Water and power Development Authority Jan, 1987 Dec, 1989 Completed
  • 10

    Kohistan Hydel Power Projects; a) Jalkot Hydel Power Station, Bisham. B) Dubair Hydel Power Station.

    Power Wing. Irriogation Depatmant Govt. of NWFP, Peshawar Jan, 1985 Jan, 1986 Completed
  • 11

    Micro Hydel Power Station Project: Complete survey and submission of feasibility Report of 15 nos Mini/Micro Hydel Power Stations in Distt Chitral (NWFP)

    Power Wing, Irrigation Department, Government of NWFP, Peshawar Jan, 1982 Mar, 1984 Completed
  • 12

    Khazana Suger Mills Power Station Project: Installation / Erection and Commissioning of 2000 KVA Marobini Steam Turbine Power House.

    Sarhad Development Authority, Governament of NWFP, Peshawar Jan, 1983 Jan, 1984 Completed
  • 13

    Kalam Hydropower Project: Installation, testing & Commissioning of complete Power House with all relevant equipment a+B4nd Systems

    Power Wing, Irrigation Department, Government of NWFP, Peshawar Jan, 1982 Dec, 1983 Completed
  • 14

    Repairs to Units 1,2,3,& 4 of Warsak Hydro-electric Power House including repaired stabilization of concrete structure, isolation of main turbine and generator block frame up stream structure and tandan grouting of turbine block and draft tube structure installation of structure monitoring istrument

    Chief Engineer (Hydel) North, WAPDA Warsak Dam Project Jan, 1991 Jan, 1982 Completed